EnVibe
888.473.5222
RELIABLE. ACCREDITED. INNOVATIVE.
Navigation
  • Services
    • Vibration Analysis
    • Advanced Rotating Equipment Vibration Analysis
    • Dynamic Field Balancing
    • Laser Alignment—Shaft and Optical
    • EnCAM—Remote Condition Asset Monitoring and Analysis
    • MAP—Motion Analysis Process
    • Stray Voltage Analysis
    • Predictive Maintenance (PdM)
    • Oil Analysis
    • Infrared Thermography
    • Background Vibration Analysis for Sensitive Operating Environments
    • Ultrasonic Evaluation
    • Accelerometer Installation
    • Vibration Monitoring Systems Calibration
    • Performance Tracking and Record Management
  • Classes
    • CAT 1 Vibration Analysis
    • CAT 2 Vibration Analysis
    • CAT 3 Vibration Analysis
    • Lubrication
    • Reliability Auditor
    • Certification Information: Vibration Analysis-Zenco
    • EnVibe Training Cancellation Policy
  • Why Choose EnVibe?
    • Safety Is Priority One
    • Our Expert Analysts
    • About Us
    • Steps to Equipment Reliability: Outline of EnVibe’s Predictive Maintenance Program
      • Case History: Carbon Seal Rub on a Steam Turbine
      • Case History: Pitfalls and Analysis of the Pre-Load Conditions of a Journal Sleeve Bearing
    • What is Predictive Maintenance?
    • Is Predictive Maintenance Effective?
      • EnVibe 5 Year Case Study
      • EnVibe 8 Year Case Study
    • EnVibe’s Analyzing Toolbelt
    • EnVibe’s Community Involvement
    • EnVibe’s Blog
    • FAQ
  • Clients
  • Contact

EnVibe Case History: Analysis of Journal Sleeve Bearing

Joe McCollum / Equipment Reliability : Knowledge /

Summary: This article describes the limitations and pitfalls of single-channel data as opposed to dual-channel data in the analysis of a journal sleeve bearing.


This article is concerned with the analysis of displacement data in mils peak to peak taken from a permanently installed multi-channel monitoring system. The proximity probes on a multi-stage compressor train are monitored weekly using a single-channel portable data collection system. The probes are mounted at approximate X-Y positions at each bearing (Figure 1). Many of the probes are not the typical X-Y position because of piping location, mechanical design and reversed probe wiring. The data show the effects of this reverse convention and non-traditional orientation. Data are collected on each proximity probe from 0 to 15xfmax. One parameter monitors synchronous amplitude vs. phase to detect phase shifts.

EnVibe_Figure-1_Proximity-Probe-Positions_WM

 

The normal operating amplitude of the horizontal proximity probe at the high-pressure (HP) compressor drive end is 0.5 mil peak to peak (Figure 2). During this period the unit was shut down for about 12 hours as a result of auxiliary equipment problems.

The HP compressor typically experiences buildup of by-product, especially when shut down. Maintenance personnel involved in evaluating the problem assumed that the elevated amplitude was a result of mass unbalance forces on the rotor assembly. The reasons were that the primary source of the vibration was at the operating speed; a substantial phase shift occurred, from 298 to 358 degrees; and the discovery that the by-product was fouling the process gas.

We collected dual-channel data simultaneously at each X-Y position. The data showed that the orbits of the HP compressor bearings had an elongated fi gure-eight pattern (Figure 3). Note the reversal of the pattern on the lower plot. The reversal is a result of the convention of the X-Y probes. The elongated fi gure-eight pattern was due to pre-load conditions on the HP compressor bearings. The pre-load condition indicates significant buildup of by-product on the case and seals, which were off loading the compressor bearings and causing the increased vibration.

The OEM representative recommended continued operation of the compressor and stated that elevated case heating would eventually liquefy the buildup of by-product and eliminate the mass unbalance of the rotor. Although we did not agree with this analysis or their prediction that the amplitude would decrease, we did agree that continued operation at 2.7 mils peak to peak would not damage the compressor because the bearing clearances were 10 mils. During the next four months of operation, the vibration amplitudes on the HP compressor remained constant (Figure 4).

At the next scheduled outage, the HP compressor case was cleaned and a new rotor assembly with new labyrinth seals was installed. No evidence of excessive product buildup was found on the old rotor (Figure 5). However, severe buildup was found in the labyrinth seals and was the source of the pre-load (Figure 6). At start-up, the amplitudes were at normal levels (Figure 7). During the past four years a procedure for minimizing buildup has been initiated and the catalyst has been changed. No pre-load effects have occurred in the many shut downs of the HP compressor (Figure 8). A continuous monitoring system has recently been installed that captures dual-channel steady-state and transient data.

It can be concluded that analysis based on single-channel data collection for X-Y proximity probes can be misleading. Such data can be useful in trending but were not suffi cient for proper analysis of this problem. Simultaneous data acquisition at each X-Y position was required to provide the correct answer. Dual-channel displays of shaft orbits, centerline plots and phase measurements are critical in analyzing rotor-dynamic responses.

About the Author Joe McCollum

Involved with Predictive Maintenance Programs since 1979, Joe has worked at Petrochemical, Power Utilities, Marine, Building Maintenance and Mining facilities. With over 33 years vibration analysis experience, his capabilities expand to rotor dynamic balance of large and small rotors ranging from 2 HP to 180MW turbo machinery, mechanical shaft alignment, acoustic analysis, seismic and structural surveys, theoretical modal analysis, ODS (operational deflection shapes), and infrared imaging technologies.

Recent Posts

  • VIBRATION ANALYSIS CERTIFICATION COURSES: CAT 1, 2 & 3, Nov & Dec 2022
  • LUBRICATION TRAINING: 1 CLASS | 3 CERTS | 5 DAYS, April 25-29, 2022
  • SIGN OF THE TIMES, LET’S MAP THEM
  • Oct 16, 2019 | Engineer Appreciation Day @ Toyota Center
  • SMRP August 8, 2019, Moody Gardens, Galveston
  • April 9, 2019 | Vibration Institute Seminar, Beaumont, Tx
  • March 21, 2019 | PMIES Expo, Pasadena, Tx
  • October 16, 2018 | ISA Automation Expo, Beaumont, Tx
  • SMRP August 16, 2018, Moody Gardens, Galveston
  • April 12, 2018 | ISA Texas Exhibition, Pasadena, Tx

Categories

  • Classes
  • Community Involvement
  • Equipment Reliability : Knowledge
  • Predictive Maintenance: Experience
  • Visit Us
  • War Stories
REQUEST QUOTE OR SITE VISITFill out form for a basic price (quote) and follow-up contact (site visit).

© 2023 EnVibe, Inc. All Rights Reserved. • 5522 Mitchelldale St., Houston, Texas 77092 • 888.473.5222 | info@envibe.com

  • Home
  • About Us
  • Equipment Reliablity Services
  • FAQ
  • Contact Us

We accept Visa, MasterCard, American Express